FIT OUT FOUR
|
|
False Floor |
|
The boatman's cabin followed the same process as the other rooms. Rub down, painted, battons fitted and insulated. | The bulkhead dividing the engine room and boatman's cabin was insulated with 2" kingspan (to reduce noise levels). A bit of lining was also fitted. |