WEEK FOUR
|
|
Roof panel in place, dragged up on the angle in the foreground. | Portholes marked ready for cutting. |
Portholes cut. |
Portholes held in place (fixing holes drilled and tapped). |
Portholes on the left hand side cut and tapped. | Roof being winched down to curve it over the roof supports to meet the cabin side. |
The gap in the hull at the bow (due to raising the hull sides to meet the bow stem) was filled with a steel fillet made from a cardboard template. |