NarrowBoat
(click here to return to the NarrowBoat Index)


WEEK FOUR
Roof panel in place, dragged up on the angle in the foreground. Portholes marked ready for cutting.
Portholes cut.

Portholes held in place (fixing holes drilled and tapped).

Portholes on the left hand side cut and tapped. Roof being winched down to curve it over the roof supports to meet the cabin side.
The gap in the hull at the bow (due to raising the hull sides to meet the bow stem) was filled with a steel fillet made from a cardboard template.